Two main jobs were being done on Saturday 29th of January 2022. The first job was the loop road being relayed . 4 panels were relayed.
The second job was clearing the main culvert under the site of years of rubbish and debris. The water was sand bagged off at the mart side to stop the flow so we could work on extending the lake side so the loop road could be layed over it .