The area was pumped out of as much water as possible and a 7 m ridged pipe rolled in. It was then backfilled with 3 inch stone . Willie Malone and Ken Fox started to build a front portal for the culvert out of recycled concrete blocks . The portal remains to be completed but will ve finished before the end of March.